General planning of a production plant for wax and polymer emulsions as ‚smart factory‘ with complete cross-linkage of production, logistics and infrastructure. An own cogeneration unit for environmentally friendly generation of electricity and heat saves 50% of CO2 emissions.
Plant for the production of 180.000 TPA formalin (55%); total investment approx. EUR 73 million; OOO Pörner Group Russia checks compliance with Russian norms and standards.
Design and construction of process plant for the production of 4,000 mty fully synthetic waxes from polyethylene and polypropylene by depolymerization. The newly developed CATPOL process allows the production of very different waxes.
General planning of a gas desulfurization plant subsequent to a nickel plant which will reduce sulfur dioxide emissions by 95% & produce 600000 tpa sulfur and thus contributing to the environmental protection of the Arctic Circle. For the project, consisting of 25 sub plants, Pörner was nominated for the Austrian State Award for Consulting 2015.
Re-installation and modernization of a formalin plant including methanol tanks and infrastructure
Turn-key formalin plant based on the Dynea silver catalyst process incl. methanol and formalin tanks and methanol unloading station
Construction of a hexamine production plant and supply including GOST-R certificate
Erection of a plant for the production of formalin
Expansion of the polyester and alkyd resin plant; Followup contract to new installation in 2006
Installation of a production plant for formalin based on the Dynea Silver Catalyst Process
Installation of a production plant for unsaturated polyester and alkyd resin
Turn-key installation of a Biturox®- Plant
Installation of a UF and MF Resin Plant with an overall investment of EUR 25 Mil.
Turn-key supply of a Formalin plant
Extension of the salicylic acid plant by a PHBS plant
Turn-key supply of a Formalin plant
Installation of an UF and MF Resin Plant with an overall investment of EUR 25 Mil.
Installation of a carpet recycling plant consisting of raw material supply and cutting, chemical treatment, de-and repolymerisation, power plant, infrastructure
Installation of a hydrogenperoxyde plant with an investment volume of EUR 70 Mil.
Revamp and partly new construction of an isethionate plant consisting of ethylene oxide storage; natrium-isethonate powder- and dilution plant, loading and unloading facility, infrastructural measures
Revamp and modernisation of parexparaffin refining and n-mehyltaurin synthesis plant
Installation of a plant for industrial wheat processing with an overall investment volume of EUR 200 Mil.