Dismantling of two melamine plants and revamp of two further melamine plants, including construction of a new wastewater treatment plant. The new wastewater treatment plant consists of two pressure vessels (hydrolyzers) connected in series, which are operated at an pressure of 45 bar and an temperature of over 230 degrees Celsius. Total investment approx.
42 million euros.
Various modernization projects for fertilizer production plants in Bangladesh.
General planning of a production plant for wax and polymer emulsions as ‚smart factory‘ with complete cross-linkage of production, logistics and infrastructure. An own cogeneration unit for environmentally friendly generation of electricity and heat saves 50% of CO2 emissions.
Modernization of the steam network and pipe racks at Linz Chemical Park incl. 3D model using laser scans. The two projects ran in parallel; all construction and installation work was done during ongoing operations.
Plant for the production of 180.000 TPA formalin (55%); total investment approx. EUR 73 million; compliance with Russian norms and standards.
Expansion of the existing facilities to increase production capacity of methylcellulose in Bitterfeld and to increase blending and loading capacity in Bomlitz
Greenfield plant for the production of epoxy resins from bisphenol and epichlorohydrin as an extension of the existing resin plants LH1 to LH3
Modernization of laboratory building for plant nutrients by fully lab operation without disruption, including the product control, changing facility and office
Re-installation and modernization of a formalin plant including methanol tanks and infrastructure
Plant for production of bisphenol TMC from phenol and acetone
Modernization of Ammonium plants, Urea plant, utilities and Urea storage facilities
Exchange of 2 process control systems with measuring points, apparatus and machines, total MCCs, low-voltage distributors, USVs & emergency power generators incl. cabling
5 shutdown within 3 years, documentation + loops + datasheets, procurement
Turn-key formalin plant based on the Dynea silver catalyst process incl. methanol and formalin tanks and methanol unloading station
Construction of a hexamine production plant and delivery including GOST-R certificate
Erection of a plant for the production of formalin
Expansion of the polyester and alkyd resin plant; Followup contract to new installation in 2006
General contractor for a high-tech catalyst plant for "gas-to-liquid" processes, first of its kind plant worldwide, development of technical fundamentals in close co-operation with the client, without the step over a pilot plant the industrial plant was erected in shortest possible execution time.
Pörner Linz was honored a nomination for the Austrian State Award of Consulting 2008.
Construction of a bisphenol F production plant
Construction of an epoxy resin production plant
(Leuna Harze 3)
Installation of a plant to the mixture, filling and storage inflammable liquids (Organica 2 for DONAU-KANOL) and in the follow-up order of chemical liquids(Anorganica 3 for DONAUCHEM)
Installation of a production plant for unsaturated polyester and alkyd resin
Installation of a production plant for formalin based on the Dynea Silver Catalyst Process
General planning for the installation of a synthetic resin production plant under reconstruction and extension of existing buildings, components and infrastructure
Engineering of a plant for production of BP-TMC made of phenol and acetone
Turn-key supply of a Formalin plant
Expansion of the salicylic acid plant by a PHBS plant
Expansion of the existing plant for production of epoxy resins (second line for the plant built in 1997) incl. (Leuna Harze 2)
Erection of a production plant for building protection agents on a silicate basis, incl. storage tanks and truck unloader
Turn Key-supply of a Formalin plant