EI&C engineering for a production plant for the production of 100% recycled paper, corrugated board and cardboard; consisting of the two core units stock preparation and paper mill. Total investment approx. 700 million dollars
TAF supplies a pyrolysis pilot plant turn-key for the research of low-temperature gasification of various feedstocks and mixtures of plastics; feedstocks expandable to biomass
Planning and execution of the integration of the new photovoltaic plant into the plant’s 6kV power grid at the Borealis site in Schwechat.
Overall planning of a thermal processing plant of various biomasses from agricultural residues (e.g. straw, hemp, flax), the wood industry (e.g. damaged wood, sawmill residues bark) and fast-growing plants (e.g. Chinese silver grass) for the production of pulp. The pilot plant enables research of alternative processes, adjustment of technical parameters, and minimization of energy and chemical input.
General planning and construction of a multi-fuel conversion plant for the recovery of phosphorus and synthesis gas from sewage sludge (Executed by TAF – a company of Pörner Group)
Study for the construction of a demonstration plant to produce 1,000 l/d of renewable jet fuel from CO2 and water from ambient air as well as renewable power,
Proof of both technical and economic feasibility
Construction of a 1 MW pilot plant for the production of synthesis gas from torrefied waste wood with plans for the expansion to a 25 MW plant.
Upfront engineering services for a 15,000 MT Liquid-sodium-silicate (LSS) production plant to obtain a +/- 10% estimate of the total CAPEX Cost and OPEX Cost; feedstock: rice hull ash; Process: Pörner bio-silicate technology
Engineering for the design and construction of the New Safe Confinement (NSC), the new safety arch for parts of the damaged nuclear power plant in Chernobyl. Read more about this project here.
Gazintek, the Ukrainian subsidiary of the Pörner Group, has provided detailed engineering of the support systems for ventilation ducts, cable trays, lifting systems and platforms for this gigantic (first in the history of engineering) project, since 2011.
General planning of a plant for the production of high-quality bio-silicates from rice hull ash based on the Pörner-Bio-Silicate-Technology. The demonstration plant is specifically designed to define and optimize the key parameters of the process for different customers.
Modification of HyLube 2 plant to produce oils Group III
Design and construction of a process plant for the production of 4,000 TPA fully synthetic waxes from polyethylene and polypropylene by depolymerization
General planning of a gas desulfurization plant subsequent to a nickel plant which will reduce sulfur dioxide emissions by 95% & produce 600000 tpa sulfur and thus contributing to the environmental protection of the Arctic Circle. For the project, consisting of 25 sub plants, Pörner was nominated for the Austrian State Award for Consulting 2015.
Installation of a 5,8 MW Back Pressure Turbine for electricity production with HP/MP (high pressure/medium pressure) and MP/LP steam back pressure with 6 kV/50Hz electric power generator
Construction of a carbon dioxide liquefaction plant
Planning and installation of the connecting piping system for a coal fired power plant (incl. district heating, process water, cooling and waste water systems, air pressure and heating systems)
Installation of a plant for production of synthetic fuels with biomass gasification using the Carbo-V® technology of CHOREN Industries GmbH, Fischer-Tropsch Synthesis, energy feed according to German regulation EEG, 2,3 MW electric power. The overall investment sums up to approx. 100 Mio. EUR.
General planning and installation of a bioethanol plant for the production of 240.000 m³ Bioethanol (the biggest industrial plant of Austria within renewable resources) with investment volume of 125 Mio. EUR.
In the Governmental approval procedure a positive notification was received within only 7 months and in only 14 months the plant was completed within time and budget.
Click HERE to see a video about the Bioethanol plant processing (Pörner YouTube Channel)
Biogas plant with production of 3.000 Nm3/h/reactor
Biogas from sugar beet slices a sugar factory's by-product. The factory utilizes the gas for its own purpose and for reduction of natural gas consuption.
General planning for the construction of a recycling plant for the extraction of unmixed plastics from electronic scrap and wastes from car recycling; capacity: 40,000 TPA
Installation of a 390 MW Gas-Combination Energy Plant in Thessaloniki with a gas turbine including a heat recovery boiler and a condensate-vapor-turbine with an overall invest of € 190 m.
General planning of central blower unit of blast furnace A (steam boiler, steam turbine, blast compressor, utility and gas piping, civil and steel structure and infrastructural equipment) and engineering of electrical, instrumentation and PLC for blast furnace A
Extension of the power and long-distance energy plant Coolkeeragh
Installation of the power and long-distance energy plant Csepel II