The new coldbox is prepared for lifting – part of the expansion and modernization of cracker facilities and the petrochemical refrigeration system to increase ethylene and propylene production by 50,000 tpa
Greenfield plant producing high-purity isobutene from the feedstock of the metathesis plant; incl. storage tanks and railcar loading station; first application of a newly developed technology from OMV and BASF worldwide
Engineering and construction of a pilot plant to produce synthetic rubber S-SBR (solution styrene-butadiene rubber). The plant is designed to develop new rubber materials for high performance tires in shorter test procedures with significant resource and primary energy savings.
Design and construction of process plant for the production of 4,000 mty fully synthetic waxes from polyethylene and polypropylene by depolymerization. The newly developed CATPOL process allows the production of very different waxes.
Reconstruction of the butadiene production plant incl. capacity increase
Capacity extension of an existing wax moulding plant for candle manufacturer, pharmaceutical, cosmetical and food industry
Revamp of the polypropylene plant on the Borstar process
General planning for the extension of a polyethylene plant with a black coloring. The feedstock is received from the PE plant co-planned by Pörner in 2005.
Capacity expansion of a polymere compounding plant, built in 1997, for the production of PE- and PP-compounds with filler contents up to 70% (e.g. glass fiber, talc, glass beads, BaSO4), semiconductive compounds (PP, PE, PS), master batches for various applications (coloring, flame-retardant, ...), high purity and food grades, compounds of specialities and many more.
Installation of a recycling plant for production of 30.000 t pure plastics out of 40.000 t electronic scrap and wastes from car recycling
Installation of a polyethylene-large-scale plant with the Borstar-process
Installation of a pilot plant for polymeric fiber production
Installation of a plastics refinement plant
General planning of the installation of a melamine production plant acc. to a OMV owned process incl. waste water and off gas treatment plants. For synergy reasons 2 plants at the same time were erected, one in Linz/Austria and one in Castellanza/Italy