Cookie Consent by Free Privacy Policy website

River Water Treatment

Engineering and construction of a plant to treat water from the Main River with a pure water capacity of 1,100 cubic meters per hour to supply the companies at Industriepark Höchst.

  • Client: Infraserv GmbH & Co. Höchst KG
  • Location: Frankfurt / Germany
  • Scope of work:
    • Basic engineering
    • Detail engineering
    • Supply
    • Assembly
    • Commissioning
  • Commissioning:   2024

More Information

Produced Water Treatment plant

Supply of a produced water treatment plant for subsequent re-injection into the reservoir with a capacity of 164 m³/h (expansion stage 1) and 82 m³/h (expansion stage 2). In the project, all three process stages of primary, secondary, and tertiary purification were upgraded, with the tertiary purification stage being extended by four walnut shell filters connected in parallel. Thus, modernization makes a significant contribution to the efficiency and environmental protection.; Execution on behalf of Siemens

  • Client: North Caspian Operating Company N.V.
  • Location: Atyrau / Kazakhstan
  • Scope of work: 
    • Basic engineering 
    • Detail engineering 
    • Project management
    • Procurement
    • Manufacturing
    • Site supervision
    • Commissioning
  • Commissioning: 2016 (expansion stage 1) / 2022 (expansion stage 2) 

More Information

Produced Water Treatment plant

Supply of a produced water treatment plant with subsequent re-injection into the reservoir with a capacity of 41,6 m³/h (6 300 BWPD); Execution on behalf of Siemens

  • Client: OMV Petrom SA
  • Location: Tazlau / Romania
  • Scope of work: 
    • Basic engineering 
    • Detail engineering 
    • Project management
    • Procurement
    • Manufacturing and installation
    • Commissioning
  • Commissioning: 2016 

River Water Treatment plant

Supply of a river water treatment plant consisting of coagulation, flocculation, sedimentation and degassing with a capacity of 33 m³/h (5 000 BWPD) for subsequent re-injection into the reservoir; Execution on behalf of Siemens

  • Client: OMV Petrom SA
  • Location: Tazlau / Romania
  • Scope of work: 
    • Basic engineering 
    • Detail engineering 
    • Project management
    • Procurement
    • Manufacturing and installation
    • Commissioning
  • Commissioning: 2016 

Produced Water Treatment plant

Supply of a produced water treatment plant with subsequent injection in the reservoir with a capacity of 100 m³/h (15 100 BWPD); Execution on behalf of Siemens

  • Client: OMV Petrom SA
  • Location: Pentru Phoenix / Romania
  • Scope of work: 
    • Basic engineering 
    • Detail engineering 
    • Project management
    • Procurement
    • Manufacturing and installation
    • Commissioning
  • Commissioning: 2016 

Produced Water Treatment plant

Supply of a produced water treatment plant with subsequent injection in the reservoir with a capacity of 100 m³/h (15 100 BWPD); Execution on behalf of Siemens

  • Client: OMV Petrom SA
  • Location: Videle / Romania
  • Scope of work: 
    • Basic engineering 
    • Detail engineering 
    • Project management
    • Procurement
    • Manufacturing and installation
    • Commissioning
  • Commissioning: 2016

Produced Water Treatment plant

Supply of a produced water treatment plant with subsequent injection in the reservoir with a capacity of 100 m³/h (15 100 BWPD); Execution on behalf of Siemens

  • Client: OMV Petrom SA
  • Location: Oprisenesti / Romania
  • Scope of work: 
    • Basic engineering 
    • Detail engineering 
    • Project management
    • Procurement
    • Manufacturing and installation
    • Commissioning
  • Commissioning: 2015

Produced Water Treatment plant

Supply of a produced water treatment plant with subsequent injection in the reservoir with a capacity of 67 m³/h (10 200 BWPD); Execution on behalf of Siemens

  • Client: Kom Munai LLP
  • Location: Aktau / Kazakhstan
  • Scope of work: 
    • Basic engineering 
    • Detail engineering 
    • Project management
    • Procurement
    • Manufacturing and installation
    • Commissioning
  • Commissioning: 2013

Process Water Treatment plant

Treatment of river water to boiler feed water with ultra-filtration, cation exchanger for decarbonisation, reverse osmosis, degassers and subsequent multistep ion exchangers with a flow rate of 300 m³/h (expansion stage 1) and 100 m³/h (expansion stage 2); Execution on behalf of Siemens

  • Client: Infraserv GmbH & Co. Höchst KG
  • Location: Industriepark Höchst / Germany
  • Scope of work: 
    • Basic engineering 
    • Detail engineering 
    • Manufacturing and installation
    • Commissioning
  • Commissioning: 2009 (expansion stage 1) / 2013 (expansion stage 2)

Ion Exchanger Line

Boiler feed water treatment with cation exchanger, degassers, anionic exchanger and subsequent mixed bed filter with a flow rate of 180 m³/h for the ion exchanger and 360 m³/h for the mixed bed filter stage; Execution on behalf of Siemens

  • Client: OMV Deutschland GmbH
  • Location: Burghausen / Germany
  • Scope of work: 
    • Basic engineering 
    • Detail engineering 
    • Manufacturing and installation supervision
    • Commissioning support
  • Commissioning: 2007

Condensate Treatment

Condensate Treatment with activated carbon filters, condensate cooling system and subsequent ion exchanging step with a flow rate of 450 m³/h; Execution on behalf of Siemens

  • Client: OMV Refining & Marketing GmbH
  • Location: Schwechat / Austria
  • Scope of work: 
    • Basic engineering 
    • Detail engineering 
    • Manufacturing and installation supervision
    • Commissioning support
  • Commissioning: 2005

Well Water Treatment plant

Well water treatment to remove iron and manganese as well as hydrocarbons with a flow rate of 450 m³/h; Execution on behalf of Siemens

  • Client: OMV Refining & Marketing GmbH
  • Location: Schwechat / Austria
  • Scope of work: 
    • Basic engineering 
    • Detail engineering 
    • Manufacturing and installation supervision
    • Commissioning support
  • Commissioning: 2001

Process Water Treatment plant

Boiler feed water treatment with cation exchanger, fine filter, reverse osmosis unit (198 membrane elements) and a subsequent degasser unit with a flow rate of 440 m³/h (expansion stage 1) and 220 m³/h (expansion stage 2); Execution on behalf of Siemens

  • Client: OMV Refining & Marketing GmbH
  • Location: Schwechat / Austria
  • Scope of work: 
    • Basic engineering 
    • Detail engineering 
    • Manufacturing and installation supervision
    • Commissioning support
  • Commissioning: 1995 (expansion stage 1) / 1998 (expansion stage 2)